BackBack
  • Test Systems
    • Wind
    • Aerospace
    • Digital Solutions
    • Electrical Test Systems
    • Foundations
  • Specialists
  • Bolt-Check
  • Cases
  • News
  • About us
  • Career
  • Contact
Back to overview
Office

Cases

Cases and references

Scroll down
Show previous cases
Test rig Rolls-Royce
23/02/2017

System delivery of test rig to Rolls-Royce

R&D Test Systems has delivered a test rig for one of the world's most powerful aerospace gearboxes to Rolls-Royce.
Test Systems
Steel
10/02/2017

Steel components to large wind power test centre

In relation to the installation of a new test centre at DTU, R&D Steel has been asked to deliver multiple steel components. The test centre is a large wind tunnel dedicated to wind power.
Wind turbine
23/01/2017

Consultants from R&D provide flexibility at LM Wind Power

LM Wind Power has selected three regular collaborators to secure flexible engineering resources. R&D is among the chosen companies.
Oil & gas
19/09/2016

Structural re-analysis of the Gorm F Topside for Maersk Oil

R&D’s strong competences within structural analysis formed the basis for the preparation of a structural re-analysis, including a complete update of load modelling, on Maersk Oil’s Gorm F platform in the North Sea.
HALT test bench
07/09/2016

R&D is building one of the world’s largest test benches for LORC

R&D will construct and deliver one of the world’s largest test benches following the turnkey order from LORC.
Test Systems
Service
Wind farm
09/08/2016

Turnkey solution to Siemens

Siemens’ new test bench at Lindoe Industrial Park operates at full stretch. R&D is responsible for the completion of the tests and has been responsible for the entire project.
Test Systems
Service
22/02/2016

Rain Erosion Tester to LM Wind Power

The guarantee of repeatability was a determining factor when LM Wind Power chose R&D Test Systems' system for their future in-house tests.
Test Systems
Service
Wind turbine farm
31/01/2016

R&D collaborates closely with Aalborg University on developing a more energy-efficient wind load test

The testing of 25 years of wind load on an 8MW offshore wind turbine requires a considerable amount of energy. R&D and AAU are collaborating on a more realistic and energy-efficient test, which will result in cheaper green energy to the consumers.
Test Systems
Load more cases
Sections
About Contact Career Cookies Privacy Policy Privacy Policy for Job Applicants
Capabilities
Test Systems Technology Development Digital Solutions Bolt-Check
Contact us
Hinnerup • Aalborg • Kolding • Viborg • Berlin • Frankfurt • Beijing +45 81 10 32 00 mail@rdas.dk